ClocksixInstitute of Planning Engineering
Foundation / beginner levelPage 03 / 07

Foundation level.

Build a solid base. Plan with confidence. Start with a blank project in Primavera P6 and finish with a schedule you can maintain, monitor and report on.
07 modulesBeginner levelHands-on in P6No prior P6 needed
Planner working on a laptop during a practical training sessionFoundation / 07 modules
THE BUILD ORDERFrom blank project to printed report
01WBS
02Calendars
03Logic
04Resources
05Baseline
06Monitor
07Report
SEC / 01The curriculum

What you'll build.

Seven modules, each one practised inside Primavera P6 on a live project file. Nothing here is a spectator exercise.

01 / 07

Creating a Project & Work Breakdown Structure (WBS)

Start with the logic of the project. Set up the EPS, define the project, and build a WBS that reflects how the work will actually be delivered.

In practice: Build a complete WBS hierarchy for a sample construction project.
02 / 07

Project Calendar

Create and assign calendars, define working days, shifts, holidays and exceptions so every duration in the schedule is grounded in reality.

In practice: Configure a site calendar with non-working periods and assign it to activities.
03 / 07

Activities & Defining Relationships

Add activities, set durations and connect them with the right logic types and lags — the foundation of a schedule that can actually be analysed.

In practice: Link a full activity network and trace the critical path.
04 / 07

Resources

Define the resource pool, assign labour and equipment to activities, and understand how assignment changes duration and cost behaviour.

In practice: Create a resource library and load it onto the schedule.
05 / 07

Cost & Baseline

Add cost data to activities, review the project budget, then save and maintain a baseline to measure performance against the approved plan.

In practice: Assign costs, save a baseline and compare it with the current schedule.
06 / 07

Maintain & Monitor Project Schedule

Update progress, reschedule the remaining work and read the changes in dates, float and the critical path with confidence.

In practice: Run a progress update cycle and interpret the resulting variance.
07 / 07

Printing Reports

Produce clear, decision-ready output: layouts, filters, grouping and print setup that communicate the schedule to the people who need it.

In practice: Prepare and export a formatted schedule report for a project review.
SEC / 02By the end of this level

You leave with a working plan.

Not a certificate-shaped memory of a demo — four concrete things you can produce on your own.

A structured project

Set up an EPS, project and WBS that mirrors how the work will actually be delivered.

A logic-driven schedule

Add activities, durations and relationships, then find and explain the critical path.

A loaded, costed plan

Assign resources and costs, save a baseline and keep the plan measurable.

Decision-ready output

Update progress and print a report a project review can actually use.

SEC / 03Level details

The essentials.

LevelFoundation — beginner level
TaglineBuild a solid base. Plan with confidence.
Starting pointNo previous Primavera P6 experience required.
Modules07 — from creating a project and WBS through to printing reports.
FormatAccelerated, practical and hands-on. Confirm schedule and venue with admissions.
Next stepProgress to Advanced level
Foundation / limited seats

Start with a solid base.